REGULATORY UPDATE
16 February 2021The Temporary Joint Venture formed by TREVI S.p.A. and DESMOS Ingegneria Ambiente Energia S.r.l. was awarded the tender for the Permanent Safety (MISP) of the “Ex Ambiente” Area within the multi-company plant in Ravenna.
The intervention consists in the encapsulation of the contaminated site owned by ENI REWIND S.p.A. through the construction of a side containment barrier, 120 cm wide pushed up to a depth of about 28 m, the realization of capping and the creation of a system for collecting, regulating and conveying rainwater to the factory sewer system.
DESMOS will make its experience available to the Customer, consolidated in many similar interventions, for the preliminary study of the plastic mixture, for the preparation of the construction project, for the final inspection and for the drafting of the “as-built” documentation.
With direct participation in the RTI, DESMOS consolidates its role as a highly specialized partner for projects of high technical complexity.